
If your product implements, generates, stores, or protects encryption, it belongs to CRYPTOSEC.
Below is the full scope of controls we may assess depending on your environment and goals. These audit domains are based on common international frameworks (ISO27001, NIST CSF, OWASP, IEC 62443, PSS) and real evaluation practices from ISO 17025-certified labs.
• Algorithm validation
• Key length & crypto policy
• PRNG entropy checks
• Protocol correctness
• Secure mode selection
• Fault injection analysis
• Side-channel resistance
• Tamper detection features
• Secure microcontroller architecture
• Key generation
• Secure distribution
• Zeroization
• Backup and recovery
• Revocation and renewal
• Crypto architecture & security policy
• KDF / PRNG analysis
• Implementation design
• Key lifecycle documentation
• Self-test & FIPS-like startup test plan
• Debug interface lockout documentation
• Secure manufacturing evidence
| Phase | Description |
|---|---|
| Phase 1 | Scoping + Product Classification |
| Phase 2 | PSS Readiness Assessment |
| Phase 3 | Documentation & ST Development |
| Phase 4 | Pre-Lab Technical Testing & DTR Mapping |
| Phase 5 | Accredited Lab Evaluation |
| Phase 6 | Certification Decision |
| Phase 7 | Assurance Continuity & Maintenance |
| Stage | Timeline |
|---|---|
| Readiness + Gap Analysis | 2–4 weeks |
| Documentation & ST development | 2–8 weeks |
| Technical preparation | 1–6 weeks |
| Lab evaluation (ITSEC) | 4–8 weeks |
| Lab evaluation (CRYPTOSEC) | 8–24+ weeks depending on CE level |
| Type | Approx Range (PKR) |
|---|---|
| ITSEC Basic | 200K–600K |
| CryptoSec CE Level 1–2 | 600K–1.5M |
| CryptoSec CE Level 3–4 | 1.5M–5M+ |

© 2026 Common Criteria Pakistan Lab. All rights reserved.